cornerpic Home Home Home
  Consulting Services
  ITS Design
  Communications Design
    Project Management
    Portfolio
    Project Web Sites
    Strategic Planning
    Systems Integration
PDF Library
Training
 
 
banner
Resources / Consulting Services / Project Web Sites / Reports Archive
 
 

Reports Archive

arrow

Task 2 - Stakeholders and Operational Objectives

arrow

Task 3 - Requirements Analysis

arrow

Task 4 - High Level System Design
arrow Task 5 - Alternative Analysis
arrow Task 6 - Recommendation
arrow Task 7 - Conceptual Design Report
arrow Task 8 - Operations and Maintenance Plan
arrow Task 9 - Technical, Operational and Institutional Issues
arrow Task 10 - City Concurrence
arrow Task 11 - Final Conceptual Design
arrow Task 12 - Strategic Implementation Plan
arrow Task 15 - Confirm Additional Streets
arrow Task 18 - CCTV Location Analysis
arrow Task 19 - Detection Location Analysis

This archive contains the reports and deliverables for the I-5/Telegraph Road Corridor project.

All files are in Adobe Acrobat (.pdf) format.

Task 2 - Stakeholders and Operational Objectives

Stakeholders' Operational Objectives and Individual City Reports - Report (741 KB)

Appendix A: Presentation Used At the Pre-Design Meetings with the Stakeholder Agencies (601 KB)

Appendix B: I-5/Telegraph Road Traffic Signal System Inventory by Intersection (126 KB)

Appendix C: Figures Depicting Communications Infrastructure for I-5/Telegraph Road Corridor (895 KB)

 Up

Task 3 - Requirements Analysis

ATMS User Requirements (347 KB)

Requirements Analysis (824 KB)

Integration System User and Functional Requirements (136 KB)

 Up

Task 4 - High Level System Design

High Level Design Definition Report (1.51 MB)

 Up

Task 5 - Alternative Analysis

Systems Analysis Report (1.53 MB)

ATMS Alternatives Analysis Report

Communications System Alternatives Analysis Report (1.25 MB)

 Up

Task 6 - Recommendation

System Reccommendation Report (6.87 MB)

 Up

Task 7 - Conceptual Design Report

Draft Conceptual Design Report

 Up

Task 8 - Operations and Maintenance Plan

Operations and Maintenance Plan

 Up

Task 9 - Technical, Operational and Institutional Issues

Technical, Operational, and Institutional Issues Report

 Up

Task 10 - City Concurrence

Letters/Resolutions indicating City Concurrence
Meeting Minutes

 Up

Task 11 - Final Conceptual Design

Final Conceptual Design Report

 Up

Task 12 - Strategic Implementation Plan

Strategic Plan Final Report

 Up

Task 15 - Confirm Additional Streets

List of Additional Streets (1.29 MB)

 Up

Task 18 - CCTV Location Analysis

CCTV Location Final (517 KB)

Draft CCTV Location Analysis (782 KB)

 Up

Task 19 - Detection Location Analysis

System Detection Analysis Final (804 KB)

Draft Detection Location Analysis (1.67 MB)

 
blank
blank graphic holder Sitemap   |  Contact Us  | Intranet blank
blank
space
Quick Links
 
blank
  Siemens in the USA
 
 
blank
Contacts
 
blank
contacts
space Sales
 
blank
contacts
space
PDF Library
 
pdf
 
Certifications
 
balnk
contacts
 
 Up

© Siemens Energy & Automation Inc. 2005-2007  - Privacy Policy / Legal Notices